Brazilian Rare Earths September 2026 Quarterly Activities Report
SYDNEY, Oct. 20, 2026 (GLOBE NEWSWIRE) -- Brazilian Rare Earths Limited (ASX: BRE / OTCQX: BRELY) ('BRE') is pleased to report progress during the quarter ended September 30, 2026. Highlights during and subsequent to the end of the quarter include:
MAIDEN ULTRA-HIGH GRADE MINERAL RESOURCE
- World-leading rare earths grade: Monte Alto’s Mineral Resource grades 11.3% TREO, more than twice the reported grades of the two established large-scale Western rare earth producers.
- Major new source of heavy rare earths plus strategic co-products: Strong dysprosium, terbium, gadolinium and yttrium enrichment, alongside potential uranium, scandium, niobium and tantalum co-products.
INTEGRATED MONTE ALTO + CAMAÇARI SCOPING STUDY
- Exceptional economics: After-tax NPV₈ of US$6.0 billion, IRR of 90%, 1.1-year payback and average annual operating free cash flow of US$1.2 billion.1
- First-quartile project: Ultra-high grades, simple ore sorting, high yields, established infrastructure and low-temperature processing underpin costs of ~US$21/kg NdPr equivalent.
SUCCESSFUL DRILLING POSITIONS MONTE ALTO FOR RESOURCE GROWTH
- Ultra-high grade extensions: ~10,000 m of drilling completed after the 22 February 2026 Scoping Study cut-off expanded mineralisation south and east/down dip and established a priority growth corridor to the north.
- Q4 2026 resource upgrade: Post-cut-off results could, subject to conversion into Mineral Resources and further studies, support mine life extension and/or increased annual production.
HIGH-GRADE SULISTA SOUTH DISCOVERY AND EXTENSIONS AT SULISTA EAST
- New discovery and extensions: High-grade mineralisation intersected over ~500 m of strike at Sulista South, while step-out drilling extended Sulista East by 430 m.
- Larger, higher-confidence resource targeted: Current step-out and infill drilling campaigns support potential resource growth and Inferred-to-Indicated conversion; updated mineral resource to follow their completion.
PRODUCED FIRST CONCENTRATE; SECURED STAGE II HYDROMET CO-FUNDING
- First concentrate: Stage I commissioning at Camaçari advances bulk metallurgical testwork for the PFS.
- Hydromet piloting: Stage II is 59% partner-funded, with commissioning planned for Q2 2027.
STRONG BALANCE SHEET TO FUND GROWTH
- A$122 million cash and no borrowings at 30 September 2026.
A link to the complete announcement can be found: here
Contacts
Bernardo Da Veiga
Managing Director and CEO
investors@brazilianrareearths.com
www.brazilianrareearths.com
__________________________________
1 Argus EU/US price case. Refer to the Scoping Study cautionary statement in this report and BRE’s ASX announcement dated 18 August 2026.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.